EU森林伐採防止規則(EUDR)ガイド
EUDR要求事項、農園ポリゴン位置情報マッピング、合法性検証、コーヒー調達におけるデューデリジェンスの解説。
EUDR位置情報データ・適合性を確認1. Polygon Geolocation Mapping
For farm plots over 4 hectares, EUDR requires GPS polygon boundaries (latitude/longitude coordinates) recorded for every farm unit supplying the lot.
2. Due Diligence Statement (DDS)
Importers submit a DDS into the EU Information System prior to clearance, certifying zero deforestation after the Dec 31, 2020 cutoff date.